Dan-Czech Special Transport executed two record consecutive Heavy Transports over 290 kms in Czech Republic last year.

IMG_1213

The route for both of them was : From Ostrava Vítkovice to the Chvaletice quay (A) on river Elbe.

MapCzech

Cargo: Heavy Forgings with below dimensions and weights:

Piece

Name:

Lenght cm:

Width cm:

Height cm:

Weight in tons:

01 Pull head

503

615

416

224

02 Tail head

503

568

415

231

  

First transport of pull head start 7.10.2013 at 23:30 and finished : 12.10.2013 at 04:00.

 

https://youtube.com/devicesupport

IMG_1375

Second transport of tail head start 23.10.2013 at 23:30 and finished : 28.10.2013 at 01:30

https://youtube.com/devicesupport

On the whole route the following bridge reinforcements were made:

DSC00056

 

DSC00081

DSC00130

DSC01713

 

DSC01780

 

IMG_0572

Special ramps as per above pictures were used on 2 places – Stará Ves nad Ondřejovicí and in Nový Jičín – Loučka.

DSC01690Special steel plates were used 3 times at : Libhošť, Nový Jičín and Dolní Újezd

IMG_0692

IMG_1248Bridge reinforcement were made on 7 bridges. Photos of some of them are enclosed.

Provizorium 004

Another special preparation that was done : Build of exit from highway R35 as per photo 0692 and 1711 

DSC01711

IMG_0629

IMG_0629_panorama

Unloading at Chvaletice quay were made by 2 heavy cranes.

IMG_4621

IMG_4625

IMG_4646

IMG_4648

IMG_4664