KolomKuweitPetroleum

 
Large Column transported on 3 m wide Goldhofer Platform trailer. Use of spitit level is essential on such a heavy and big transport, as stability is close to the limits

 Leave a Reply

(required)

(required)

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

© 2011 Heavyliftspecialist Links | About me | Contact